ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
Moreno Plumbing, Heating & Cooling has served Albuquerque and Rio Rancho since 1987, and owner Ernie Moreno brings over 35 years of hands-on HVAC experience to every job. The company maintains, repairs, and replaces existing residential geothermal ground-source heat pump systems — if you have a well-designed loop field already in the ground, Moreno can keep your system running efficiently for decades. They no longer take on new geothermal installations or air-to-geothermal retrofits due to drilling cost and site complexity, but for existing GSHP owners in Albuquerque, Moreno is one of the few local contractors with the expertise to service ground-coupled equipment. Their full service menu also covers furnaces, boilers, radiant heat, plumbing, and air conditioning for comprehensive mechanical care.
Service Details
schedule
Years in Business
38 years
Business Hours
Mon8a-5p
Tue8a-5p
Wed8a-5p
Thu8a-5p
Fri8a-5p
SatClosed
SunClosed
Regulatory Context
Geothermal Permitting in New Mexico
Geothermal heat pump installations in New Mexico require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
Geothermal heat pump installation in Albuquerque typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in New Mexico to compare pricing.
Most New Mexico municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Albuquerque building department for specific requirements.
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Albuquerque's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Most properties in Albuquerque, New Mexico can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Request a Quote from Moreno Plumbing, Heating & Cooling
Our team reviews your request before sending it to Moreno Plumbing, Heating & Cooling. If they can help, they will contact you directly.
✓
Quote Request Received
Thanks — we'll review your request and forward it to Moreno Plumbing, Heating & Cooling within 1 business day. If you asked to compare quotes, we'll pass it to up to two more local installers as well. They typically respond within 1–2 business days after that.
If you need to reach Moreno Plumbing, Heating & Cooling directly: (505) 433-2040
Geothermal heat pump installations in New Mexico may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.