ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
Jacob's HVAC/R has served the Wenatchee area and north-central Washington for more than 20 years, offering installation, replacement, repair, and maintenance for ground-source geothermal heat pump systems alongside a full HVAC and refrigeration service menu. Their technicians assess each property to determine whether a vertical loop (deeper excavation for smaller lots) or horizontal piping layout (shallower trenching across larger properties) is better suited to site conditions. Jacob's holds a Washington State HVAC/R trade license (JACOBHL8671S) and an electrical administrator license (GILLAJN860DC), covering the full scope of geothermal system work including electrical hookup. The company carries a wide manufacturer lineup — including American Standard, Bryant, Carrier, Daikin, Lennox, Mitsubishi, Trane, and others — allowing them to source equipment matched to load calculations and budget requirements.
Jacob's HVAC/R installs ground-source geothermal heat pumps in Wenatchee and north-central Washington. Vertical and horizontal loop systems.
Geothermal heat pump installations in Washington require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
Geothermal heat pump installation in Wenatchee typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in Washington to compare pricing.
Most Washington municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Wenatchee building department for specific requirements.
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Wenatchee's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Most properties in Wenatchee, Washington can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Our team reviews your request before sending it to Jacob's HVAC/R. If they can help, they will contact you directly.
✓
Quote Request Received
Thanks — we'll review your request and forward it to Jacob's HVAC/R within 1 business day. If you asked to compare quotes, we'll pass it to up to two more local installers as well. They typically respond within 1–2 business days after that.
If you need to reach Jacob's HVAC/R directly: (509) 293-1441
Geothermal heat pump installations in Washington may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.