ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
Hodgdon Well Drilling, Inc. is a Poland, Maine well drilling and pump services company with roots dating to 1928 and incorporated in 1984. The company provides water well drilling, geothermal system installation, pump installation and repair, well fracturing, and water filtration services, working across Maine and New Hampshire. It is currently led by President C.T. Skip Hodgdon, Vice President Scott Hodgdon, and Secretary Lori Hodgdon. Scott Hodgdon serves as the current president of the Maine Ground Water Association Board of Directors. The company is located at 53 Mechanic Falls Road in Poland. Geothermal services are confirmed through independent search records; the company website blocks automated access at the time of audit. No IGSHPA certification or WaterFurnace dealer affiliation has been surfaced through any source. The business is not BBB-accredited and is listed by the BBB as not rated due to insufficient information.
Poland ME well driller since 1928. Hodgdon Well Drilling offers geothermal, pump & well services in ME and NH. Scott Hodgdon is MGWA Board president.
Geothermal heat pump installations in Maine require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
Geothermal heat pump installation in Poland typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in Maine to compare pricing.
Most Maine municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Poland building department for specific requirements.
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Poland's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Most properties in Poland, Maine can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Our team reviews your request before sending it to Hodgdon Well Drilling, Inc.. If they can help, they will contact you directly.
✓
Quote Request Received
Thanks — we'll review your request and forward it to Hodgdon Well Drilling, Inc. within 1 business day. If you asked to compare quotes, we'll pass it to up to two more local installers as well. They typically respond within 1–2 business days after that.
If you need to reach Hodgdon Well Drilling, Inc. directly: (207) 782-4533
Geothermal heat pump installations in Maine may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.