ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
Hamilton Industries is a full-service mechanical contractor based in Burnaby, British Columbia, specializing in geothermal heat pump installation and maintenance for residential, commercial, and industrial clients throughout Metro Vancouver. The company installs WaterFurnace geothermal heat pump systems and provides ground loop engineering, custom geothermal system design, and HVAC integration. Additional services include VRF systems, heating and cooling, refrigeration, energy management, and alternative energy solutions. Hamilton Industries holds Technical Safety BC and refrigeration licences and has served the Vancouver market for many years.
Hamilton Industries in Burnaby BC installs WaterFurnace geothermal systems for residential and commercial Metro Vancouver clients.
Service Details
factory
Brands Installed
WaterFurnace
water_drop
WaterFurnace
Authorized Dealer
Service Area
Serves 3 areas across British Columbia
BurnabyVancouverMetro Vancouver
Regulatory Context
Geothermal Permitting in British Columbia
Geothermal heat pump installations in British Columbia require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
Geothermal heat pump installation in Burnaby typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in British Columbia to compare pricing.
Most British Columbia municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Burnaby building department for specific requirements.
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Burnaby's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Most properties in Burnaby, British Columbia can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Our team reviews your request before sending it to Hamilton Industries. If they can help, they will contact you directly.
✓
Quote Request Received
Thanks — we'll review your request and forward it to Hamilton Industries within 1 business day. If you asked to compare quotes, we'll pass it to up to two more local installers as well. They typically respond within 1–2 business days after that.
If you need to reach Hamilton Industries directly: (604) 434-3971
Geothermal heat pump installations in British Columbia may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.