ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
East Coast Well Drilling Inc. (ECWDI) provides water well drilling and geothermal loop installation on Florida's Space Coast from its Rockledge base. The company holds three Florida water well licenses (#11248, #7335, and #7342) and is a National Ground Water Association (NGWA) member. Co-founders Dave Primost and Ben Bogus lead the operation, which serves residential and commercial clients throughout Brevard County. Note: Company website operates on HTTP only with TLS issue — accessible but HTTPS not configured. Founding year not confirmed.
Space Coast well driller with three FL water well licenses and NGWA membership for geothermal loop installation.
Service Details
precision_manufacturing
Boring Methods
Vertical
factory
Brands Installed
Service Area
Serves 1 area across Florida
Brevard County and Space Coast
Regulatory Context
Geothermal Permitting in Florida
Geothermal heat pump installations in Florida require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
How much does geothermal installation cost in Rockledge, Florida?add
Geothermal heat pump installation in Rockledge typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in Florida to compare pricing.
Do I need a permit for geothermal drilling in Florida?add
Most Florida municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Rockledge building department for specific requirements.
How long does a geothermal system last in Rockledge?add
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Rockledge's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Is my property in Rockledge suitable for geothermal?add
Most properties in Rockledge, Florida can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Request a Quote from East Coast Well Drilling Inc.
Your request goes straight to East Coast Well Drilling Inc.. You'll hear from them directly, usually within 1-2 business days.
✓
Quote Request Received
Thanks — we'll review your request and forward it to East Coast Well Drilling Inc. within 1 business day. If you asked to compare quotes, we'll pass it to up to two more local installers as well. They typically respond within 1–2 business days after that.
If you need to reach East Coast Well Drilling Inc. directly: (321) 631-5212
Geothermal heat pump installations in Florida may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.