ℹ️ This listing has not been claimed by the business owner. Information shown
is compiled from public records and may not be current.
Claim this listing to update your business information.
Bridger Drilling is a family-owned well drilling company based in Belgrade, Montana, offering geothermal well drilling and ground-source heat exchanger installation alongside domestic, irrigation, and commercial water wells. The company holds licenses, bonding, and insurance and is a member of both the Montana Well Drillers Association and the National Ground Water Association. Bridger Drilling serves the Gallatin Valley and the broader southwestern Montana region from its Belgrade location.
Verified active operator per bridgerdrilling.com (Bundle 5 import 2026-05-29)
Bridger Drilling in Belgrade, MT drills geothermal wells and ground-source heat exchanger boreholes for southwest Montana homes and businesses.
Service Details
precision_manufacturing
Boring Methods
Rotary drilling
factory
Brands Installed
Regulatory Context
Geothermal Permitting in Montana
Geothermal heat pump installations in Montana require specific permits and compliance with state regulations regarding well drilling, loop installation, and refrigerant handling. Contact your local building department for specific requirements in your area.
How much does geothermal installation cost in Belgrade, Montana?add
Geothermal heat pump installation in Belgrade typically costs between $18,000–$45,000 depending on system size, loop type (vertical vs. horizontal), lot conditions, and home square footage. Available state and utility incentives can reduce net cost (federal §25D credit ended Dec 31, 2025 under OBBBA; §48 commercial ITC may still apply). Request quotes from multiple certified installers in Montana to compare pricing.
Do I need a permit for geothermal drilling in Montana?add
Most Montana municipalities require permits for geothermal well drilling and ground loop installation. Requirements vary by county — some require driller licensing, environmental impact review, or water well permits. Your geothermal installer should handle the permitting process. Contact your local Belgrade building department for specific requirements.
How long does a geothermal system last in Belgrade?add
Geothermal heat pumps typically last 20–25 years for the indoor unit and 50+ years for the ground loop. In Belgrade's climate, a properly maintained system provides reliable heating and cooling with minimal degradation. Annual professional maintenance and filter changes every 3 months help maximize system lifespan.
Is my property in Belgrade suitable for geothermal?add
Most properties in Belgrade, Montana can support geothermal systems. Vertical loop systems require minimal land area (as little as a standard residential lot), while horizontal loops need more yard space. A qualified installer will conduct a site assessment including soil conductivity testing to determine the best loop configuration for your property.
Own this business?
Claim this listing to update services, pricing, and respond to quote requests.
Your request goes straight to Bridger Drilling. You'll hear from them directly, usually within 1-2 business days.
✓
Quote Request Received
Thanks — we'll review your request and forward it to up to 3 verified IGSHPA installers in Belgrade within 1 business day. They typically respond within 1–2 business days after that.
If you need to reach Bridger Drilling directly: (406) 388-7227
Geothermal heat pump installations in Montana may require drilling permits, environmental site assessments, and compliance with local well and thermal energy regulations. Requirements vary by jurisdiction and system type (vertical, horizontal, open-loop). Contact your local municipality, state energy office, or a licensed geothermal installer for specific permitting requirements in your area.